Numinbah Correctional Centre Water Treatment Plant
Taylor Environmental have undertaken the design, controls philosophy, documentation and preliminary pricing for a new water treatment plant at Numinbah Correctional Centre. This replacement 100kL/d plant will incorporate sand filtration, UV and Chlorine disinfection. Monitoring will be installed to ensure water meets strict quality guidelines, and minimises losses to backwash which were using large amounts of water in the existing plant.
80 George Street Brisbane Greywater Treatment Plant Design and Project Management
The collection of greywater from showers, washing machines and sinks across the 7 storey site, treating it and using the recycled water for toilet flushing will save up to 2.5kL of potable water every day in this government building. This installation, designed and project managed by Taylor Environmental is believed to be a first for a commercial government building in Queensland. Design Manager James Foster says: "Taylor Environmental are providing design and technical expertise together with project management skills to deliver this project on time and on budget". Being a novel project, there are however, extra hoops to jump though. "Crossing the t and dotting the i's is all part of the day job when it comes to implementing a project which hasn't been undertaken before in Queensland. We hope that the success of this demonstration project will pave the way for greywater treatment to be rolled out into government and private sector buildings across the state".
Auditing and Performance Optimisation of Sewerage Treatment Plants, Department of Public Works
Department of Public Works have engaged Taylor Environmental as technical consultants to conduct rolling audits and performance optimisation of a number of sewerage treatment plants throughout Queensland. In two separate engagements, Taylor Environmental are providing senior technical expertise and managing upgrades and rectification works at STPs in Correctional Centres and in schools throughout the state to ensure the STPs are achieving compliance with their environmental licenses and to optimise opportunities for effluent reuse.
Works programs for each STP include implementation of audit outcomes, including full operator training, preparing and updating operator manuals, preparing and updating site based management plans, implementing routine soil and effluent monitoring programs, equipment upgrade, EPA reporting and process engineering and rectification works as required.
Ongoing Client Support – working together
Taylor Environmental have been providing ongoing support to the Department of Public Works Environmental Engineering Division covering all aspects of water management within the division, including process engineering for water/ wastewater and greywater treatment, preparing and reporting on WEMPs, project management of WEMP outcomes, treatment plant auditing, process optimisation and rectification, sub-metering, Green Star planning, water demand management planning, water supply management and environmental compliance management. Through the support given by Taylor Environmental, this small team of 8 people was able to scoop 2 (of 6) Public Service Excellence Awards in 2008. We offer them our congratulations and are very proud to be working closely with this team!
Moore Park State School Treatment Plant Rectification, Department of Public Works
Taylor Environmental worked with a project team including Department of Public Works, Q Build and GHD to rectify a sewerage treatment plant which has been exceeding EPA license limits for nitrates and pH for some time. Due to the location of the STP next to a protected wetland, and the lack of a full time operator, it was important to deliver robust and long term solutions. Taylor Environmental have been able to identify a solution where previous consultants have withdrawn from the project without success. Through installation of a new DO probe and aeration system, together with carbon dosing and modification of alum dosing, the treatment plant has been shown to consistently meet performance requirements. The project has operated as a trial for the design and implementation of methanol dosing in small (<100 EP) treatment plants. The success of this project has resulted in Taylor Environmental being engaged by Department of Public Works to resolve performance problems on a number of other treatment plants in schools around Queensland.
Woodford Correctional Centre Biosolids Treatment Upgrade
Taylor Environmental are currently undertaking a biosolids treatment / disposal upgrade for Woodford Correctional Centre. This upgrade includes looking at the economics of options and providing the best commercial solution for the plant at up to 1500EP capacity. Biosolids currently are either dried in an undercover shed or put through a hired Belt Press. The proposed system for the centre is a polymer dosing system, belt press and contracted off-site disposal. Taylor Environmental are providing the process design, procurement, construction supervision and commissioning of the new system on behalf of QBuild and the Department of Corrective Services.